[{"data":1,"prerenderedAt":1889},["ShallowReactive",2],{"site-shell":3,"i-lucide:phone":178,"published-home-page":181,"i-lucide:layers-3":1855,"i-lucide:panels-top-left":1857,"i-lucide:between-horizontal-start":1859,"i-lucide:blocks":1861,"i-lucide:arrow-up-right":1863,"i-lucide:hard-hat":1865,"i-lucide:clipboard-check":1867,"i-lucide:handshake":1869,"i-lucide:building-2":1871,"i-lucide:clock-3":1873,"i-lucide:shield-check":1875,"i-lucide:scan-line":1877,"i-lucide:calendar-check":1879,"i-lucide:users-round":1881,"i-lucide:minus":1883,"i-lucide:ruler":1885,"i-lucide:plus":1887},{"site":4,"contact":29,"navigation":50,"footer":93,"seo":98,"publishedPages":105,"headerNavigation":176,"footerNavigation":177,"headerCta":87},{"id":5,"abn":6,"acn":7,"defaultSocialImage":8,"displayName":9,"extension":10,"favicon":11,"legalName":12,"logoAlt":13,"logoDark":14,"logoDefault":11,"logoLight":14,"logoMark":14,"meta":15,"primaryColor":16,"secondaryColor":17,"shortCompanyDescription":18,"shortName":19,"stem":20,"tagline":14,"underConstruction":21,"__hash__":28},"siteSettings\u002Fsettings\u002Fsite.yml","86 654 992 542","654 992 542","\u002Fmedia\u002Fpages\u002FHome-Hero.jpg","USS Formwork","yml","\u002Fmedia\u002Fbrand\u002Fuss-logo.svg","UNIQUE STRUCTURE SERVICES PTY LTD","Unique Structure Services","",{},"#0C59C3","#C04F51","Formwork and structural concrete solutions delivered with a focus on quality, safety and dependable project execution.","USS","settings\u002Fsite",{"enabled":22,"eyebrow":23,"title":24,"heading":25,"description":26,"statusText":27},false,"New website in progress","Website under construction","Website under construction.","We're preparing a new online home for USS Formwork. Please check back soon.","Quality, safety and dependable delivery","jpjKijT-fUT5ZhHTemDxU_d3LXZf10PFxHNUq_zEiOE",{"id":30,"addressLines":31,"businessHours":33,"email":35,"extension":10,"locality":14,"mapUrl":36,"meta":37,"operatingAreas":38,"phone":41,"postcode":42,"socialLinks":43,"state":39,"stem":48,"__hash__":49},"contactSettings\u002Fsettings\u002Fcontact.yml",[32],"Rouse Hill",[34],"08:00 - 16:00","enquiries@ussformwork.com.au","https:\u002F\u002Fmaps.app.goo.gl\u002FNfqfC7FJMZ5VjPWG7",{},[39,40],"NSW","ACT","1300 797 144","2155",[44],{"label":45,"url":46,"icon":47},"Linkedin","https:\u002F\u002Fwww.linkedin.com\u002Fcompany\u002Fuss-formwork\u002Fhome","\u002Fmedia\u002Fbrand\u002Flinkedin.svg","settings\u002Fcontact","65r7xUC1dIVl-_i-yYy5o1Vp_nYdzCSqgBPQ8Y_-Hts",{"id":51,"extension":10,"items":52,"meta":86,"primaryCta":87,"stem":91,"__hash__":92},"navigationSettings\u002Fsettings\u002Fnavigation.yml",[53,58,62,66,70,74,78,82],{"label":54,"href":55,"sortOrder":56,"showInHeader":57,"showInFooter":57},"Home","\u002F",0,true,{"label":59,"href":60,"sortOrder":61,"showInHeader":57,"showInFooter":57},"Services","\u002Fservices",10,{"label":63,"href":64,"sortOrder":65,"showInHeader":57,"showInFooter":57},"Projects","\u002Fprojects",20,{"label":67,"href":68,"sortOrder":69,"showInHeader":57,"showInFooter":57},"About","\u002Fabout",30,{"label":71,"href":72,"sortOrder":73,"showInHeader":57,"showInFooter":57},"Insights","\u002Finsights",40,{"label":75,"href":76,"sortOrder":77,"showInHeader":57,"showInFooter":57},"Careers","\u002Fcareers",50,{"label":79,"href":80,"sortOrder":81,"showInHeader":57,"showInFooter":57},"Contact","\u002Fcontact",60,{"label":83,"href":84,"sortOrder":85,"showInHeader":22,"showInFooter":57},"Privacy","\u002Fprivacy",70,{},{"label":88,"href":80,"target":89,"variant":90},"Discuss a project","_self","primary","settings\u002Fnavigation","PoU45BXFdmhBH6ADZhnwPoW8I0NiDIh-F_zWANeJUEo",{"id":94,"extension":10,"meta":95,"showContact":57,"showDescription":57,"showRegistrationNumbers":57,"stem":96,"__hash__":97},"footerSettings\u002Fsettings\u002Ffooter.yml",{},"settings\u002Ffooter","qptFRifibzc022-RBjWBBoCtDqkK7_96-NlMbDcVSSw",{"id":99,"defaultDescription":18,"defaultSocialImage":8,"defaultTitle":9,"extension":10,"indexingEnabled":57,"locale":100,"meta":101,"siteName":9,"stem":102,"titleTemplate":103,"__hash__":104},"seoSettings\u002Fsettings\u002Fseo.yml","en_AU",{},"settings\u002Fseo","%s | USS Formwork","XSlMxoSvOIUWUKK1y5DFoHo15JmyCEQGjRwgeuQ6h3c",[106,112,121,130,139,148,157,166],{"id":107,"title":9,"extension":10,"meta":108,"published":57,"route":55,"seo":109,"sortOrder":56,"stem":110,"summary":18,"__hash__":111},"pages\u002Fpages\u002Fhome.yml",{},{"title":9,"description":18,"ogImage":8,"noIndex":22,"canonical":14},"pages\u002Fhome","YTRlZIQ6LOX_bY2ItYWnrMD3_Q339cYJxONMsr0-gX0",{"id":113,"title":67,"extension":10,"meta":114,"published":57,"route":68,"seo":115,"sortOrder":61,"stem":118,"summary":119,"__hash__":120},"pages\u002Fpages\u002Fabout.yml",{},{"title":116,"description":117,"ogImage":14,"noIndex":22,"canonical":14},"About USS Formwork","Learn about the practical, safety-conscious and collaborative approach USS Formwork brings to formwork and concrete structure delivery.","pages\u002Fabout","USS Formwork delivers formwork and concrete structures through practical planning, site coordination and consistent workmanship.","T4L3xbDKCnqesI27_ICCbfqj6kDAlQ877brGy88LPUA",{"id":122,"title":59,"extension":10,"meta":123,"published":57,"route":60,"seo":124,"sortOrder":65,"stem":127,"summary":128,"__hash__":129},"pages\u002Fpages\u002Fservices.yml",{},{"title":125,"description":126,"ogImage":14,"noIndex":22,"canonical":14},"Formwork and Structural Concrete Services","Explore the delivery approach and published services of USS Formwork for formwork and concrete structures.","pages\u002Fservices","Formwork and structural concrete delivery shaped around project requirements, programme and site conditions.","Yk95qLJVI_5tZeFvrFcBaLkUJFheh3zYJc2EJEXa-Kg",{"id":131,"title":63,"extension":10,"meta":132,"published":57,"route":64,"seo":133,"sortOrder":69,"stem":136,"summary":137,"__hash__":138},"pages\u002Fpages\u002Fprojects.yml",{},{"title":134,"description":135,"ogImage":14,"noIndex":22,"canonical":14},"Projects | USS Formwork","Explore USS Formwork projects across residential, commercial and industrial concrete construction in New South Wales.","pages\u002Fprojects","USS Formwork project profiles covering structural context, delivery scope, key project facts and site photography.","mIKvqhVaFrdXQvu9-GaowOvI806sRpyjM5-BhRPDq9I",{"id":140,"title":71,"extension":10,"meta":141,"published":57,"route":72,"seo":142,"sortOrder":73,"stem":145,"summary":146,"__hash__":147},"pages\u002Fpages\u002Finsights.yml",{},{"title":143,"description":144,"ogImage":14,"noIndex":22,"canonical":14},"Formwork and Concrete Construction Insights","Read practical articles from USS Formwork on formwork methods, construction accuracy, concrete structures and project delivery.","pages\u002Finsights","Practical articles on formwork methods, concrete construction, project coordination and structural delivery.","316e_hWYjJo8laF_ZOvprK3foE25n6jlELxYxoPxzSI",{"id":149,"title":75,"extension":10,"meta":150,"published":57,"route":76,"seo":151,"sortOrder":77,"stem":154,"summary":155,"__hash__":156},"pages\u002Fpages\u002Fcareers.yml",{},{"title":152,"description":153,"ogImage":14,"noIndex":22,"canonical":14},"Careers at USS Formwork","Explore current opportunities or submit a general application to work with USS Formwork on concrete construction projects.","pages\u002Fcareers","Explore current opportunities or submit a general application to work with USS Formwork.","Rxef3KgTdEWuct9XbCZxrvg92C72Y3czljWqQ3alLFI",{"id":158,"title":79,"extension":10,"meta":159,"published":57,"route":80,"seo":160,"sortOrder":81,"stem":163,"summary":164,"__hash__":165},"pages\u002Fpages\u002Fcontact.yml",{},{"title":161,"description":162,"ogImage":14,"noIndex":22,"canonical":14},"Contact | USS Formwork","Contact USS Formwork about formwork and structural concrete requirements for an upcoming project.","pages\u002Fcontact","Send a project enquiry to USS Formwork or use confirmed business contact details when available.","hIWZPbcYW_fFCslxnwznofb385ETHZhFwwlMyHJmIvk",{"id":167,"title":168,"extension":10,"meta":169,"published":57,"route":84,"seo":170,"sortOrder":85,"stem":173,"summary":174,"__hash__":175},"pages\u002Fpages\u002Fprivacy.yml","Privacy notice",{},{"title":171,"description":172,"ogImage":14,"noIndex":57,"canonical":14},"Privacy notice | USS Formwork","Read how USS Formwork handles information supplied through this website.","pages\u002Fprivacy","Information about how USS Formwork handles website enquiries and personal information.","8_MtRTgHhMdh7Vc54VcZkb-9FZ3PjHv6n9T6_HEym50",[53,58,62,66,70,74,78],[53,58,62,66,70,74,78,82],{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":180},24,"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M13.832 16.568a1 1 0 0 0 1.213-.303l.355-.465A2 2 0 0 1 17 15h3a2 2 0 0 1 2 2v3a2 2 0 0 1-2 2A18 18 0 0 1 2 4a2 2 0 0 1 2-2h3a2 2 0 0 1 2 2v3a2 2 0 0 1-.8 1.6l-.468.351a1 1 0 0 0-.292 1.233a14 14 0 0 0 6.392 6.384\"\u002F>",{"page":182,"homepage":185,"services":302,"projects":420,"statistics":848,"clients":873,"accreditations":937,"testimonials":938,"insights":939},{"id":107,"title":9,"extension":10,"meta":183,"published":57,"route":55,"seo":184,"sortOrder":56,"stem":110,"summary":18,"__hash__":111},{},{"title":9,"description":18,"ogImage":8,"noIndex":22,"canonical":14},{"id":186,"accreditations":187,"capabilityStrip":191,"clients":209,"contactCta":213,"extension":10,"featuredProjects":219,"hero":229,"insights":241,"intro":248,"meta":257,"services":258,"statistics":266,"stem":274,"testimonials":275,"whyUs":278,"__hash__":301},"homepage\u002Fhome.yml",{"enabled":22,"eyebrow":188,"heading":189,"intro":14,"maxItems":190},"Accreditations","Documented standards and credentials.",6,{"enabled":57,"items":192},[193,197,201,205],{"title":194,"description":195,"icon":196,"sortOrder":61,"published":57},"Safety first","Planning and site awareness are treated as part of every stage of delivery.","lucide:shield-check",{"title":198,"description":199,"icon":200,"sortOrder":65,"published":57},"Quality workmanship","Careful execution supports accurate, consistent structural outcomes.","lucide:scan-line",{"title":202,"description":203,"icon":204,"sortOrder":69,"published":57},"Reliable delivery","Work is coordinated around project requirements, programme and site conditions.","lucide:calendar-check",{"title":206,"description":207,"icon":208,"sortOrder":73,"published":57},"Collaborative approach","Clear coordination helps USS work effectively with builders and wider project teams.","lucide:users-round",{"enabled":57,"eyebrow":210,"heading":211,"intro":212,"maxItems":61},"Clients","Working alongside project teams.","USS Formwork works with builders and delivery teams across residential, commercial and industrial concrete construction.",{"enabled":22,"eyebrow":214,"heading":215,"description":216,"primaryCta":217},"Start a conversation","Have a project in mind?","Talk to USS Formwork about your upcoming formwork or structural concrete requirements.",{"label":218,"href":80,"target":89,"variant":90},"Discuss your project",{"enabled":57,"eyebrow":220,"heading":221,"intro":222,"layout":223,"selectionMode":224,"selectedItems":225,"maxItems":226,"cta":227},"Selected work","Projects defined by structure, coordination and delivery.","Explore selected projects that show USS formwork and concrete structure delivery across a range of building types and site conditions.","elegant-metro","featured",[],5,{"label":228,"href":64,"target":89,"variant":90},"Explore our projects",{"enabled":57,"autoplay":57,"autoplayInterval":230,"slides":231},6500,[232],{"eyebrow":233,"heading":234,"description":18,"image":8,"imageAlt":235,"video":14,"videoPoster":14,"primaryCta":236,"secondaryCta":237,"overlayStrength":239,"imagePosition":240},"Formwork and structural concrete","STRUCTURES BUILT WITH PRECISION","Site crew installing reinforcement and slab formwork in a deep urban excavation.",{"label":228,"href":64,"target":89,"variant":90},{"label":218,"href":80,"target":89,"variant":238},"secondary",90,"center",{"enabled":22,"eyebrow":71,"heading":242,"intro":243,"maxItems":244,"cta":245},"Updates from USS.","Published articles and project updates can appear here when the Insights section launches.",3,{"label":246,"href":72,"target":89,"variant":247},"View all insights","text",{"enabled":57,"eyebrow":249,"heading":250,"description":251,"image":252,"imageAlt":253,"secondaryImage":254,"secondaryImageAlt":255,"cta":256},"About USS","Built around quality. Driven by delivery.","USS Formwork works with builders and project teams across concrete construction, with a focus on practical formwork delivery, careful coordination, safe execution and consistent workmanship. We approach each project around its structural requirements, programme and site conditions, working closely with the wider project team from mobilisation through delivery.","\u002Fmedia\u002Fpages\u002Fhome-intro-main.jpg","Suspended slab formwork with plywood panels, timber bearers and shoring inside an excavation.","\u002Fmedia\u002Fpages\u002Fhome-intro-second.jpg","Workers installing black deck formwork at the base of a deep concrete-walled excavation.",{"label":116,"href":68,"target":89,"variant":247},{},{"enabled":57,"eyebrow":259,"heading":260,"intro":261,"selectionMode":224,"selectedItems":262,"maxItems":263,"cta":264},"What we do","Structural delivery shaped around the project.","Explore USS capabilities across formwork, reinforced concrete structures, suspended slabs and vertical elements.",[],4,{"label":265,"href":60,"target":89,"variant":90},"View all services",{"enabled":57,"eyebrow":267,"heading":268,"intro":269,"selectedItems":270},"By the numbers","Verified experience and dedication","A snapshot of the experience and project delivery recorded across the USS team.",[271,272,273],"projects-delivered","years-experience","area-delivered","home",{"enabled":22,"eyebrow":276,"heading":277,"intro":14,"maxItems":244},"Project feedback","What project partners say.",{"enabled":57,"eyebrow":279,"heading":280,"intro":281,"image":282,"imageAlt":283,"items":284},"Why USS Formwork","A practical approach to structural delivery.","Our approach centres on the details that support safe, coordinated and dependable work on site.","\u002Fmedia\u002Fprojects\u002Fyenora\u002Fhero-alternate.webp","Yellow beams and modular formwork panels assembled for a suspended slab.",[285,289,293,297],{"title":286,"description":287,"icon":288,"sortOrder":61,"published":57},"Safety and planning","We consider the work sequence, site conditions and coordination requirements as part of preparing for delivery.","lucide:hard-hat",{"title":290,"description":291,"icon":292,"sortOrder":65,"published":57},"Quality and accuracy","Careful execution and attention to structural requirements guide the way work is delivered.","lucide:ruler",{"title":294,"description":295,"icon":296,"sortOrder":69,"published":57},"Reliable project delivery","We work around programme needs and changing site conditions with a focus on clear, practical delivery.","lucide:clipboard-check",{"title":298,"description":299,"icon":300,"sortOrder":73,"published":57},"Collaboration on site","Open coordination with builders, trades and project teams helps keep responsibilities and requirements clear.","lucide:handshake","uHCJAAJtRyZnmV0swJc0SR4_VnO5lXAPPZRxCx7kK8k",[303,334,363,391],{"id":304,"title":305,"applications":306,"capabilities":310,"description":316,"extension":10,"featured":57,"gallery":317,"heroImage":318,"heroImageAlt":319,"icon":320,"meta":321,"published":57,"relatedProjectIds":322,"seo":327,"shortTitle":305,"slug":330,"sortOrder":61,"stem":331,"summary":332,"__hash__":333},"services\u002Fservices\u002Fformwork.yml","Formwork",[307,308,309],"Multi-residential developments","Commercial buildings","Industrial and mixed-use structures",[311,312,313,314,315],"Suspended slab formwork","Wall and column formwork","Slab edges, openings and set-downs","Conventional and modular formwork integration","Formwork striking and propping coordination","USS Formwork plans and delivers project-specific formwork for reinforced concrete structures, coordinating deck, edge and vertical-element requirements with the structural programme and wider site sequence.",[],"\u002Fmedia\u002Fservices\u002Fservice-formwork-alternative-bw.webp","Wall and column formwork braced beside reinforcement cages on a concrete slab.","lucide:panels-top-left",{},[323,324,325,326],"53-regent-st-kograh","56-ramsay-rd-five-dock","143-south-st-marsden-park","27-nelson-st-yenora",{"title":328,"description":329,"ogImage":14,"noIndex":22,"canonical":14},"Formwork Services","Practical formwork delivery for reinforced concrete structures, coordinated around project geometry, programme and site conditions.","formwork","services\u002Fformwork","USS Formwork provides practical formwork solutions for concrete construction, with attention to safe installation, dimensional accuracy, programme requirements and efficient site delivery.","lQGqb0w2zcQlLEAgytedaTULTmyQLqYntwzHcr55i_8",{"id":335,"title":336,"applications":337,"capabilities":341,"description":347,"extension":10,"featured":57,"gallery":348,"heroImage":349,"heroImageAlt":350,"icon":351,"meta":352,"published":57,"relatedProjectIds":353,"seo":356,"shortTitle":336,"slug":359,"sortOrder":65,"stem":360,"summary":361,"__hash__":362},"services\u002Fservices\u002Fconcrete-structures.yml","Concrete structures",[338,339,340],"Multi-storey residential structures","Commercial concrete structures","Industrial and mixed-use developments",[342,343,344,345,346],"Reinforced concrete slabs","Walls, columns and vertical elements","Structural openings and set-downs","Concrete placement coordination","Progressive formwork and propping cycles","USS supports reinforced concrete structure delivery by coordinating formwork, structural interfaces and concrete activities across each stage of the construction sequence.",[],"\u002Fmedia\u002Fservices\u002Fservice-concrete-structures-primary.webp","Exposed reinforced concrete floor plates with temporary edge protection on a multi-storey structure.","lucide:building-2",{},[354,355,325,326],"58-regent-st-kograh","18-jeanette-st-east-ryde",{"title":357,"description":358,"ogImage":14,"noIndex":22,"canonical":14},"Reinforced Concrete Structures","Coordinated delivery of reinforced concrete structures with attention to sequencing, workmanship, quality and site programme requirements.","concrete-structures","services\u002Fconcrete-structures","USS supports the delivery of reinforced concrete structures through coordinated site execution, with a focus on workmanship, quality and maintaining alignment with the wider construction programme.","wLbop_P7vejfSIfbXfHmBqmyysL7e37CXr3wMP_NGBo",{"id":364,"title":365,"applications":366,"capabilities":370,"description":376,"extension":10,"featured":57,"gallery":377,"heroImage":378,"heroImageAlt":379,"icon":380,"meta":381,"published":57,"relatedProjectIds":382,"seo":383,"shortTitle":386,"slug":387,"sortOrder":69,"stem":388,"summary":389,"__hash__":390},"services\u002Fservices\u002Fsuspended-slabs-and-vertical-elements.yml","Suspended slabs and vertical elements",[367,368,369],"Repetitive multi-storey floor plates","Basements and podiums","Commercial and residential structures",[371,372,373,374,375],"Suspended slab decks","Slab edges and openings","Reinforced concrete walls","Columns and core elements","Temporary propping and reshoring coordination","USS coordinates formwork for suspended slabs, walls, columns and related vertical elements, with the system and work sequence adapted to the geometry and programme of each structure.",[],"\u002Fmedia\u002Fservices\u002Fservice-slabs-vertical-elements-primary.webp","Construction crew placing concrete around reinforcement on an elevated slab.","lucide:between-horizontal-start",{},[323,354,324,326],{"title":384,"description":385,"ogImage":14,"noIndex":22,"canonical":14},"Suspended Slabs and Vertical Elements","Formwork delivery for suspended slabs, walls, columns and vertical concrete elements, planned around structural geometry and sequencing.","Slabs and vertical elements","suspended-slabs-and-vertical-elements","services\u002Fsuspended-slabs-and-vertical-elements","Our formwork capabilities can support structural elements such as suspended slabs, walls, columns and other vertical concrete components where appropriate to the project scope.","h6iMapVLSQFUZ8I6DMke5Oyd21xq3KBh0K-JVVnIiqg",{"id":392,"title":393,"applications":394,"capabilities":398,"description":404,"extension":10,"featured":57,"gallery":405,"heroImage":406,"heroImageAlt":407,"icon":408,"meta":409,"published":57,"relatedProjectIds":410,"seo":412,"shortTitle":415,"slug":416,"sortOrder":73,"stem":417,"summary":418,"__hash__":419},"services\u002Fservices\u002Fcommercial-and-multi-residential-structures.yml","Commercial and multi-residential structures",[395,396,339,397],"Apartment developments","Mixed-use buildings","Multi-building developments",[399,400,401,402,403],"Multi-level structural formwork","Repetitive slab-cycle planning","Basement and podium formwork","Vertical element coordination","Staged delivery across multiple work fronts","USS works with builders and delivery teams on commercial and multi-residential concrete structures, adapting formwork planning and site execution to repeated floor cycles, complex interfaces and changing project conditions.",[],"\u002Fmedia\u002Fservices\u002Fservice-commercial-multi-residential-alternative-crane.webp","Multi-storey concrete frame under construction beside a tower crane.","lucide:blocks",{},[411,323,354,324,325],"37-reis-st-tallawong",{"title":413,"description":414,"ogImage":14,"noIndex":22,"canonical":14},"Commercial and Multi-residential Structures","Formwork and concrete structure delivery for commercial and multi-residential projects, coordinated around programme and site conditions.","Commercial and multi-residential","commercial-and-multi-residential-structures","services\u002Fcommercial-and-multi-residential-structures","USS can support concrete construction across commercial and multi-residential project environments, adapting delivery to the structure, programme and site constraints of each project.","e168MBOQ0JvUWFwmWpNRNTKTDTe8utYXZj9cy6_COnA",[421,500,567,645,710,763,811],{"id":422,"title":423,"approach":424,"basementLevels":425,"builder":426,"buildingCount":427,"cardImage":428,"cardImageAlt":429,"categories":430,"challenge":431,"client":426,"clientLogo":14,"completionDate":432,"developer":426,"extension":10,"featured":57,"floorArea":433,"formworkSystems":434,"gallery":438,"heroImage":463,"heroImageAlt":464,"keyFacts":465,"location":423,"materialsSystems":466,"meta":468,"numberOfLevels":226,"otherFacts":469,"outcome":473,"overallProgressPercent":474,"overview":475,"progressItems":476,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":478,"scopeItems":479,"scopeSummary":483,"sectors":484,"seo":486,"serviceIds":489,"shortTitle":490,"slug":325,"sortOrder":61,"startDate":491,"stem":492,"structureDescription":493,"subtitle":494,"summary":495,"testimonialId":14,"video":496,"videoPoster":497,"videoTitle":498,"__hash__":499},"projects\u002Fprojects\u002Fmarsden-park.yml","143 South Street Marsden Park","Repetitive formwork zones, temporary support and material movements were coordinated across the site to support parallel work fronts and successive concrete pours.",1,"BATHLA",8,"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fcard.webp","Formwork materials organised across the concrete base of an excavation.",[305,336],"The eight-building layout and broad project footprint required formwork resources, crane movements and concrete activities to be coordinated across multiple work fronts.","2025-01-15","38000",[435,436,437],"Plywood deck formwork","Timber bearers and shoring","Slab edge formwork",[439,441,444,447,450,453,456,459],{"image":440,"alt":429,"caption":14,"sortOrder":61},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-01.webp",{"image":442,"alt":443,"caption":14,"sortOrder":65},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-02.webp","Tower crane above deck formwork with a rainbow in the background.",{"image":445,"alt":446,"caption":14,"sortOrder":69},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-03.webp","Shoring and timber bearers assembled for suspended slab formwork.",{"image":448,"alt":449,"caption":14,"sortOrder":73},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-04.webp","Yellow edge framing around installed black deck formwork.",{"image":451,"alt":452,"caption":14,"sortOrder":77},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-05.webp","Site crew assembling bearers and shoring for the next slab section.",{"image":454,"alt":455,"caption":14,"sortOrder":81},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-06.webp","Worker setting timber above reinforcement and slab edge formwork.",{"image":457,"alt":458,"caption":14,"sortOrder":85},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-07.webp","Installed formwork deck with materials and perimeter scaffolding.",{"image":460,"alt":461,"caption":14,"sortOrder":462},"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fgallery-08.webp","Vertical aerial view of concrete slabs and a reinforced strip under construction.",80,"\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fhero.webp","Tower crane above slab formwork and shoring with a rainbow over the Marsden Park site.",[],[342,467],"Reinforced concrete vertical elements",{},[470],{"label":471,"value":472},"Source-recorded area","38,000 m²","The recorded structural works reached completion in January 2025 across the eight-building development.",null,"USS Formwork supported BATHLA on a multi-building concrete structure at 143 South Street, Marsden Park. The project comprised eight buildings over five levels and one basement level, with the photographed works showing deck formwork, shoring, slab edges and reinforcement progressing across the site.",[],"completed","Marsden Park, NSW",[480,311,481,482],"Basement slab formwork","Slab edge and infill formwork","Temporary propping and shoring","USS Formwork's scope covered formwork and concrete structure activities across the development, including basement and suspended slabs, slab edges, temporary support and coordination around reinforcement and concrete placement.",[485],"Multi-residential",{"title":487,"description":488,"ogImage":14,"noIndex":22,"canonical":14},"143 South Street Marsden Park Project","An eight-building, five-level formwork and concrete structure project delivered with BATHLA in Marsden Park.",[330,359,387,416],"Marsden Park","2024-06-15","projects\u002Fmarsden-park","Eight-building concrete development comprising five levels, one basement level and a source-recorded area of 38,000 m².","Eight-building concrete structure delivered across a large Marsden Park site.","An eight-building, five-level formwork and concrete structure project delivered with BATHLA at 143 South Street, Marsden Park.","\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fproject-video.mp4","\u002Fmedia\u002Fprojects\u002Fmarsden-park\u002Fvideo-poster.webp","143 South St Marsden Park project site video","Q1WcmK1wCKMQqKnpa9jzt5zzQcsZf-IwApJ1kDBwjBg",{"id":501,"title":502,"approach":503,"basementLevels":474,"builder":504,"buildingCount":425,"cardImage":505,"cardImageAlt":506,"categories":507,"challenge":508,"client":504,"clientLogo":14,"completionDate":509,"developer":14,"extension":10,"featured":57,"floorArea":510,"formworkSystems":511,"gallery":514,"heroImage":538,"heroImageAlt":539,"keyFacts":540,"location":502,"materialsSystems":541,"meta":543,"numberOfLevels":226,"otherFacts":544,"outcome":547,"overallProgressPercent":474,"overview":548,"progressItems":549,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":550,"scopeItems":551,"scopeSummary":553,"sectors":554,"seo":556,"serviceIds":559,"shortTitle":560,"slug":326,"sortOrder":65,"startDate":561,"stem":562,"structureDescription":563,"subtitle":564,"summary":565,"testimonialId":14,"video":14,"videoPoster":14,"videoTitle":14,"__hash__":566},"projects\u002Fprojects\u002Fyenora.yml","27 Nelson Street Yennora","Table and conventional slab formwork, temporary support and reinforcement interfaces were sequenced across the broad floorplate to support successive concrete pours.","ORWELL","\u002Fmedia\u002Fprojects\u002Fyenora\u002Fcard.webp","Tower crane and concrete pump above reinforcement work on an elevated slab.",[305,336],"The broad industrial floorplate required formwork, reinforcement, crane movements and concrete pumping to be coordinated across several active work areas.","2024-03-20","29500",[512,513,482],"Table formwork","Conventional slab formwork",[515,518,521,524,527,530,533,535],{"image":516,"alt":517,"caption":14,"sortOrder":61},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-01.webp","Yellow beams and table formwork supporting an elevated deck.",{"image":519,"alt":520,"caption":14,"sortOrder":65},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-02.webp","Dense reinforcement and service conduits prepared across a slab.",{"image":522,"alt":523,"caption":14,"sortOrder":69},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-03.webp","Worker clearing a completed concrete floor beside perimeter scaffolding.",{"image":525,"alt":526,"caption":14,"sortOrder":73},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-04.webp","Temporary props supporting a concrete slab between round columns.",{"image":528,"alt":529,"caption":14,"sortOrder":77},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-05.webp","Concrete columns and slab viewed across an open floor under construction.",{"image":531,"alt":532,"caption":14,"sortOrder":81},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-06.webp","Site crew preparing slab reinforcement at sunset.",{"image":534,"alt":506,"caption":14,"sortOrder":85},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-07.webp",{"image":536,"alt":537,"caption":14,"sortOrder":462},"\u002Fmedia\u002Fprojects\u002Fyenora\u002Fgallery-08.webp","Tower cranes spanning a broad concrete deck during reinforcement work.","\u002Fmedia\u002Fprojects\u002Fyenora\u002Fhero.webp","Site crew tying slab reinforcement at sunset on the Yennora project.",[],[342,542],"Reinforced concrete columns",{},[545],{"label":471,"value":546},"29,500 m²","The recorded five-level concrete structure works reached completion in March 2024.","USS Formwork supported ORWELL on the concrete structure at 27 Nelson Street, Yennora. The five-level, multi-purpose industrial project used a combination of slab formwork, temporary propping and reinforcement coordination across a broad floorplate.",[],"Yennora, NSW",[311,481,482,552],"Coordination with reinforcement and concrete placement","USS Formwork's scope covered slab and concrete structure activities, including table and conventional formwork, temporary support, slab edges and coordination around reinforcement and concrete placement.",[555],"Multi-purpose industrial",{"title":557,"description":558,"ogImage":14,"noIndex":22,"canonical":14},"27 Nelson Street Yennora Project","A five-level, 29,500 m² formwork and concrete structure project delivered with ORWELL in Yennora.",[330,359,387],"Yennora","2023-11-01","projects\u002Fyenora","Five-level, multi-purpose industrial concrete structure with a source-recorded area of 29,500 m².","Five-level industrial concrete structure delivered across a broad Yennora floorplate.","A five-level, 29,500 m² formwork and concrete structure project delivered with ORWELL at 27 Nelson Street, Yennora.","rlyOquHEylKhocenfdObaFj5GSKoSXm5v5-dHuG5b5U",{"id":568,"title":569,"approach":570,"basementLevels":571,"builder":572,"buildingCount":425,"cardImage":573,"cardImageAlt":574,"categories":575,"challenge":576,"client":572,"clientLogo":14,"completionDate":577,"developer":572,"extension":10,"featured":57,"floorArea":578,"formworkSystems":579,"gallery":581,"heroImage":613,"heroImageAlt":614,"keyFacts":615,"location":569,"materialsSystems":616,"meta":618,"numberOfLevels":619,"otherFacts":620,"outcome":623,"overallProgressPercent":474,"overview":624,"progressItems":625,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":626,"scopeItems":627,"scopeSummary":629,"sectors":630,"seo":631,"serviceIds":634,"shortTitle":635,"slug":324,"sortOrder":69,"startDate":636,"stem":637,"structureDescription":638,"subtitle":639,"summary":640,"testimonialId":14,"video":641,"videoPoster":642,"videoTitle":643,"__hash__":644},"projects\u002Fprojects\u002Ffive-docks.yml","56 Ramsay Road Five Dock","Basement and suspended slab formwork, vertical elements, temporary support and reinforcement interfaces were staged around the tower crane and concrete placement sequence.",2,"K2 Construction","\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fcard.webp","Aerial view of a tower crane spanning slab and formwork construction.",[305,336],"The two basement levels and constrained urban footprint required formwork, access, lifting and concrete activities to be carefully coordinated as the structure progressed.","2026-08-01","18800",[435,436,580],"Vertical and curved wall formwork",[582,585,588,591,594,597,600,603,606,609],{"image":583,"alt":584,"caption":14,"sortOrder":61},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-01.webp","Basement reinforcement and vertical formwork beside a tower crane.",{"image":586,"alt":587,"caption":14,"sortOrder":65},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-02.webp","Black formwork sheets installed around slab openings and concrete upstands.",{"image":589,"alt":590,"caption":14,"sortOrder":69},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-03.webp","Timber bearers and shoring assembled for the next suspended slab.",{"image":592,"alt":593,"caption":14,"sortOrder":73},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-04.webp","Overhead view of a tower crane spanning concrete and formwork work areas.",{"image":595,"alt":596,"caption":14,"sortOrder":77},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-05.webp","Site crew assembling shoring and formwork around a concrete work area.",{"image":598,"alt":599,"caption":14,"sortOrder":81},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-06.webp","Formwork deck panels installed with yellow safety screens over openings.",{"image":601,"alt":602,"caption":14,"sortOrder":85},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-07.webp","Aerial view of reinforcement, formwork and a tower crane across the site.",{"image":604,"alt":605,"caption":14,"sortOrder":462},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-08.webp","Curved wall formwork prepared with external reinforcing steel.",{"image":607,"alt":608,"caption":14,"sortOrder":239},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-09.webp","Site crew placing and finishing concrete between reinforced sections.",{"image":610,"alt":611,"caption":14,"sortOrder":612},"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fgallery-10.webp","Timber bearers and shoring viewed from above within the basement structure.",100,"\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fhero.webp","Basement slab reinforcement and wall formwork arranged around a tower crane.",[],[342,617],"Reinforced concrete walls and columns",{},7,[621],{"label":471,"value":622},"18,800 m²","The project records identify August 2026 as the completion date for the seven-level concrete structure.","USS Formwork supported K2 Construction on the concrete structure at 56 Ramsay Road, Five Dock. The single-building project comprises seven levels over two basement levels, with photographed works spanning basement reinforcement, wall and slab formwork, temporary support and concrete placement.",[],"Five Dock, NSW",[480,311,628,482],"Wall, column and core formwork","USS Formwork's scope covers formwork and concrete structure activities across the basement and upper levels, including slab decks, vertical elements, temporary support and coordination around reinforcement and concrete placement.",[485],{"title":632,"description":633,"ogImage":14,"noIndex":22,"canonical":14},"56 Ramsay Road Five Dock Project","A seven-level, two-basement formwork and concrete structure project delivered with K2 Construction in Five Dock.",[330,359,387,416],"Five Dock","2025-12-15","projects\u002Ffive-docks","Single seven-level concrete structure over two basement levels.","Seven-level concrete structure over two basement levels in Five Dock.","A seven-level, two-basement formwork and concrete structure project delivered with K2 Construction at 56 Ramsay Road, Five Dock.","\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fproject-video.mp4","\u002Fmedia\u002Fprojects\u002Ffive-docks\u002Fvideo-poster.webp","56 Ramsay Rd Five Dock project site video","Z7YVWevtY785sgoiP39QAPt-PXKHIV1ptGLEvy7erME",{"id":646,"title":647,"approach":648,"basementLevels":571,"builder":649,"buildingCount":425,"cardImage":650,"cardImageAlt":651,"categories":652,"challenge":653,"client":649,"clientLogo":14,"completionDate":654,"developer":649,"extension":10,"featured":57,"floorArea":14,"formworkSystems":655,"gallery":657,"heroImage":650,"heroImageAlt":651,"keyFacts":682,"location":647,"materialsSystems":683,"meta":685,"numberOfLevels":686,"otherFacts":687,"outcome":690,"overallProgressPercent":612,"overview":691,"progressItems":692,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":693,"scopeItems":694,"scopeSummary":695,"sectors":696,"seo":697,"serviceIds":700,"shortTitle":701,"slug":323,"sortOrder":73,"startDate":702,"stem":703,"structureDescription":704,"subtitle":705,"summary":699,"testimonialId":14,"video":706,"videoPoster":707,"videoTitle":708,"__hash__":709},"projects\u002Fprojects\u002F53-regent-st-kograh.yml","53 Regent Street Kogarah","Deck formwork, shoring, vertical elements, reinforcement interfaces and concrete pours were coordinated in stages to maintain workable areas and support the structural sequence.","LANDMARK","\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53-hero.jpg","Workers placing and finishing concrete beside deck formwork in a deep basement excavation.",[305,336],"The deep urban excavation and close neighbouring properties required formwork, access and concrete activities to be carefully sequenced within a constrained footprint.","2023-09-14",[435,436,656],"Vertical element formwork",[658,661,664,667,670,673,676,679],{"image":659,"alt":660,"sortOrder":61},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (2).jpg","Site crew installing services and reinforcement across a basement slab before a concrete pour.",{"image":662,"alt":663,"sortOrder":65},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (3).jpg","Formwork crew fixing black plywood deck panels over timber bearers in the basement.",{"image":665,"alt":666,"sortOrder":69},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (5).jpg","Aerial view of the excavated Kogarah site during early basement works.",{"image":668,"alt":669,"sortOrder":73},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (6).jpg","Aerial view of a deep shored excavation with plant working on the basement level.",{"image":671,"alt":672,"sortOrder":77},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (7).jpg","Basement slab formwork and shoring progressing against concrete retaining walls.",{"image":674,"alt":675,"sortOrder":81},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (8).jpg","Aerial view of deck formwork and shoring arranged around the tower crane.",{"image":677,"alt":678,"sortOrder":85},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (9).jpg","Site crew placing and levelling concrete across a reinforced basement slab.",{"image":680,"alt":681,"sortOrder":462},"\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (10).jpg","Workers finishing a concrete slab between wall reinforcement and timber edge forms.",[],[342,684],"Reinforced concrete walls and cores",{},13,[688],{"label":471,"value":689},"20,900 m²","The project reached recorded completion in September 2023 after successive basement and upper-level structural work cycles.","USS Formwork supported concrete structure delivery at 53 Regent Street, a single-building development comprising 13 levels and two basement levels. The photographed works show the project progressing from deep excavation and basement formation through slab reinforcement, deck formwork and concrete placement.",[],"Kogarah, NSW",[480,311,628,482],"USS Formwork's scope covered formwork and concrete structure activities across the basement and upper levels, including slab decks, vertical elements, temporary support and coordination around reinforcement and concrete placement.",[485],{"title":698,"description":699,"ogImage":14,"noIndex":22,"canonical":14},"53 Regent Street Kogarah Project","A 13-level, two-basement formwork and concrete structure project delivered with Landmark at 53 Regent Street, Kogarah.",[330,359,387,416],"53 Regent Street","2023-03-29","projects\u002F53-regent-st-kograh","Single 13-level concrete structure with two basement levels and a source-recorded area of 20,900 m².","Thirteen-level concrete structure over two basement levels in Kogarah.","\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (1).mp4","\u002Fmedia\u002Fprojects\u002Fkograh-53\u002Fkograh-53 (1).webp","53 Regent Street Kogarah project site video","vY7cxVD1VwrWVQaenb9KNeVnWJyv8ru0tu_-Ih9ukPc",{"id":711,"title":712,"approach":713,"basementLevels":571,"builder":714,"buildingCount":425,"cardImage":715,"cardImageAlt":716,"categories":717,"challenge":718,"client":714,"clientLogo":14,"completionDate":719,"developer":714,"extension":10,"featured":22,"floorArea":14,"formworkSystems":720,"gallery":721,"heroImage":715,"heroImageAlt":716,"keyFacts":740,"location":712,"materialsSystems":741,"meta":743,"numberOfLevels":686,"otherFacts":744,"outcome":747,"overallProgressPercent":612,"overview":748,"progressItems":749,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":693,"scopeItems":750,"scopeSummary":752,"sectors":753,"seo":754,"serviceIds":757,"shortTitle":758,"slug":354,"sortOrder":77,"startDate":759,"stem":760,"structureDescription":761,"subtitle":705,"summary":756,"testimonialId":14,"video":14,"videoPoster":14,"videoTitle":14,"__hash__":762},"projects\u002Fprojects\u002F58-regent-st-kograh.yml","58 Regent Street Kogarah","Temporary support, deck formwork, vertical elements and stair construction were staged with reinforcement and concrete activities to support the structural sequence through the basement and upper levels.","HYZ","\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58-hero.jpeg","Concrete slab and reinforced walls under construction with formwork and site crew in a basement.",[305,336],"The deep basement excavation and adjoining occupied properties required formwork, access and concrete works to be coordinated within a constrained urban site.","2022-09-01",[435,436,656],[722,725,727,729,732,735,737],{"image":723,"alt":724,"sortOrder":61},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58-sub-hero.jpeg","Basement walls, core elements and shoring prepared for the next suspended slab.",{"image":726,"alt":255,"sortOrder":65},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58 (2).jpg",{"image":728,"alt":255,"sortOrder":69},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58 (3).jpg",{"image":730,"alt":731,"sortOrder":73},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58 (4).jpg","Worker standing on timber stair formwork as concrete is placed into the steps.",{"image":733,"alt":734,"sortOrder":77},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58 (5).jpg","Basement slab formwork and shoring arranged around a tower crane.",{"image":736,"alt":253,"sortOrder":81},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58 (6).jpg",{"image":738,"alt":739,"sortOrder":85},"\u002Fmedia\u002Fprojects\u002Fkograh-58\u002Fkograh-58 (7).jpg","Aerial view of deck formwork and shoring progressing around a tower crane.",[],[342,684,742],"Reinforced concrete stairs",{},[745],{"label":471,"value":746},"27,251 m²","The project reached recorded completion in September 2022 after the basement and upper-level concrete structure works.","USS Formwork supported concrete structure delivery at 58 Regent Street, a single-building development comprising 13 levels and two basement levels. The photographed works show basement walls, core elements, slab formwork, stair construction and progressive concrete placement within the excavated site.",[],[480,311,628,751,482],"Stair formwork","USS Formwork's scope covered formwork and concrete structure activities across the basement and upper levels, including slab decks, vertical elements, stairs, temporary support and coordination around reinforcement and concrete placement.",[485],{"title":755,"description":756,"ogImage":14,"noIndex":22,"canonical":14},"58 Regent Street Kogarah Project","A 13-level, two-basement formwork and concrete structure project delivered with HYZ at 58 Regent Street, Kogarah.",[330,359,387,416],"58 Regent Street","2022-03-21","projects\u002F58-regent-st-kograh","Single 13-level concrete structure with two basement levels and a source-recorded area of 27,251 m².","R4BaswWdrcu_GNvhYi7EAqLyQGcMxETxDVrRnVNvup8",{"id":764,"title":765,"approach":766,"basementLevels":425,"builder":767,"buildingCount":425,"cardImage":768,"cardImageAlt":769,"categories":770,"challenge":771,"client":767,"clientLogo":14,"completionDate":772,"developer":767,"extension":10,"featured":22,"floorArea":773,"formworkSystems":774,"gallery":775,"heroImage":784,"heroImageAlt":778,"keyFacts":785,"location":786,"materialsSystems":787,"meta":789,"numberOfLevels":571,"otherFacts":790,"outcome":793,"overallProgressPercent":474,"overview":794,"progressItems":795,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":796,"scopeItems":797,"scopeSummary":798,"sectors":799,"seo":801,"serviceIds":804,"shortTitle":805,"slug":355,"sortOrder":81,"startDate":806,"stem":807,"structureDescription":808,"subtitle":809,"summary":803,"testimonialId":14,"video":14,"videoPoster":14,"videoTitle":14,"__hash__":810},"projects\u002Fprojects\u002Fbehbuild.yml","18 Jeanette Street East Ryde","Slab and edge formwork was coordinated with reinforcement and concrete placement in practical stages suited to the compact site and low-rise structure.","BehBuild","\u002Fmedia\u002Fprojects\u002Fbehbuild\u002Fcard.webp","Concrete slabs, starter bars and materials arranged across the project site.",[305,336],"The compact residential site required materials, reinforcement, formwork and concrete operations to be sequenced within a limited working area.","2025-06-15","1100",[435,436,437],[776,779,781],{"image":777,"alt":778,"caption":14,"sortOrder":61},"\u002Fmedia\u002Fprojects\u002Fbehbuild\u002Fgallery-01.webp","Reinforcement mesh and edge formwork prepared across a concrete deck.",{"image":780,"alt":769,"caption":14,"sortOrder":65},"\u002Fmedia\u002Fprojects\u002Fbehbuild\u002Fgallery-02.webp",{"image":782,"alt":783,"caption":14,"sortOrder":69},"\u002Fmedia\u002Fprojects\u002Fbehbuild\u002Fgallery-03.webp","Timber bearers and shoring arranged for suspended slab formwork.","\u002Fmedia\u002Fprojects\u002Fbehbuild\u002Fhero.webp",[],"18 Jeanette St East Ryde",[342,788],"Reinforcement mesh and starter bars",{},[791],{"label":471,"value":792},"1,100 m²","The recorded concrete structure works reached completion in June 2025.","USS Formwork worked with BehBuild on the reinforced concrete structure at 18 Jeanette Street. The project comprised two levels over one basement, with slab reinforcement, edge formwork and concrete placement coordinated across a compact residential site.",[],"East Ryde, NSW",[480,311,437,482],"USS Formwork's scope covered basement and suspended slab formwork, slab edges, temporary support and coordination with reinforcement and concrete placement.",[800],"Residential",{"title":802,"description":803,"ogImage":14,"noIndex":22,"canonical":14},"18 Jeanette Street East Ryde Project","A two-level residential concrete structure over one basement level, delivered with BehBuild at 18 Jeanette Street, East Ryde.",[330,359,387],"East Ryde","2025-04-16","projects\u002Fbehbuild","Two-level reinforced concrete structure over one basement level.","Low-rise reinforced concrete structure delivered with BehBuild in East Ryde.","xaVLCbPuRlXKNsLZ7k8Sj8HKVreDwX9b3_P2c4RtrX4",{"id":812,"title":813,"approach":814,"basementLevels":425,"builder":815,"buildingCount":571,"cardImage":14,"cardImageAlt":14,"categories":816,"challenge":817,"client":815,"clientLogo":14,"completionDate":818,"developer":14,"extension":10,"featured":22,"floorArea":14,"formworkSystems":819,"gallery":820,"heroImage":14,"heroImageAlt":14,"keyFacts":821,"location":822,"materialsSystems":823,"meta":824,"numberOfLevels":190,"otherFacts":825,"outcome":828,"overallProgressPercent":474,"overview":829,"progressItems":830,"progressLabel":14,"progressLastUpdated":14,"projectStatus":477,"published":57,"region":831,"scopeItems":832,"scopeSummary":835,"sectors":836,"seo":837,"serviceIds":840,"shortTitle":841,"slug":411,"sortOrder":462,"startDate":842,"stem":843,"structureDescription":844,"subtitle":845,"summary":846,"testimonialId":14,"video":14,"videoPoster":14,"videoTitle":14,"__hash__":847},"projects\u002Fprojects\u002F37-reis-st-tallawong.yml","37 Reis Street Tallawong","The work was planned by building and level so formwork, reinforcement and concrete activities could progress in a coordinated sequence with JASARA and the wider project team.","JASARA",[305,336],"Coordinating the structural sequence across two buildings required clear planning of work areas, formwork cycles and interfaces between basement and upper-level construction.","2023-09-21",[],[],[],"37 Reis St Tallawong",[],{},[826],{"label":471,"value":827},"18,177 m²","The recorded project programme reached completion in September 2023 after delivery across the two-building structure.","USS Formwork supported concrete structure delivery at 37 Reis Street, working across two buildings, six levels and one basement level. The project was delivered for JASARA between March and September 2023, with formwork activities coordinated around the structural sequence and site programme.",[],"Tallawong, NSW",[833,311,834],"Basement-level formwork","Vertical concrete elements","USS Formwork's scope focused on formwork and concrete structure delivery across the basement and upper levels, coordinated with JASARA and the wider site team.",[485],{"title":838,"description":839,"ogImage":14,"noIndex":22,"canonical":14},"37 Reis Street Tallawong Project","A two-building, six-level formwork and concrete structure project delivered with JASARA at 37 Reis Street, Tallawong.",[330,359,387,416],"Tallawong","2023-03-27","projects\u002F37-reis-st-tallawong","Two six-level buildings with one basement level and a source-recorded area of 18,177 m².","Two-building concrete structure delivered for JASARA in Tallawong.","A two-building, six-level project in Tallawong with one basement level and a source-recorded area of 18,177 m².","9SLgFaHREW1cKU9_trD92iB950U7XZZoGbOvMNgOhDw",[849,858,866],{"id":850,"description":851,"extension":10,"icon":351,"label":852,"meta":853,"prefix":14,"published":57,"slug":271,"sortOrder":61,"stem":854,"suffix":855,"value":856,"__hash__":857},"statistics\u002Fstatistics\u002Fprojects-delivered.yml","International Projects","Projects delivered",{},"statistics\u002Fprojects-delivered","+","25","21U78THWdnUQ02Is0gpmrLcJ4o7sWNoziKAJD-mNshA",{"id":859,"description":14,"extension":10,"icon":860,"label":861,"meta":862,"prefix":14,"published":57,"slug":273,"sortOrder":65,"stem":863,"suffix":855,"value":864,"__hash__":865},"statistics\u002Fstatistics\u002Farea-delivered.yml","lucide:clock-3","Total Area Delivered",{},"statistics\u002Farea-delivered","300K","_-1GaYR-12PuB65AI10qlgGSM3lmabclbhZb4L8iPhQ",{"id":867,"description":14,"extension":10,"icon":860,"label":868,"meta":869,"prefix":14,"published":57,"slug":272,"sortOrder":65,"stem":870,"suffix":855,"value":871,"__hash__":872},"statistics\u002Fstatistics\u002Fyears-experience.yml","Years of experience",{},"statistics\u002Fyears-experience","30","QxeowVrjmoNQalbKkebZPAPXOadxHo5lLUGnU25LUHg",[874,883,892,901,910,919,928],{"id":875,"extension":10,"featured":22,"logo":876,"meta":877,"name":878,"published":57,"slug":879,"sortOrder":61,"stem":880,"website":881,"__hash__":882},"clients\u002Fclients\u002Fbathla.yml","\u002Fmedia\u002Fclients\u002Fthe-bathla-group-logo.jpg",{},"Bathla","bathla","clients\u002Fbathla","https:\u002F\u002Fwww.bathla.com.au\u002F","KT2tV18kjCmmOCG6clQDU_p19D2e4TtsTa-I0DFybZI",{"id":884,"extension":10,"featured":22,"logo":885,"meta":886,"name":887,"published":57,"slug":888,"sortOrder":61,"stem":889,"website":890,"__hash__":891},"clients\u002Fclients\u002Fbehbuild.yml","\u002Fmedia\u002Fclients\u002Fbehbuild.png",{},"Beh Build","behbuild","clients\u002Fbehbuild","https:\u002F\u002Fbehbuild.com.au\u002F","izKjb6W_aAZYzRxywYdc5_Uu14QfwSiJ9nKoTqliJng",{"id":893,"extension":10,"featured":22,"logo":894,"meta":895,"name":896,"published":57,"slug":897,"sortOrder":61,"stem":898,"website":899,"__hash__":900},"clients\u002Fclients\u002Fhyz.yml","\u002Fmedia\u002Fclients\u002Fhyz.webp",{},"HYZ Development Group","hyz","clients\u002Fhyz","https:\u002F\u002Fwww.hyzgroup.com.au\u002F","Yk4a3jIEMPwebGpzGFhpCWGZOm_AwBh6EGCLl8EZJ5s",{"id":902,"extension":10,"featured":22,"logo":903,"meta":904,"name":905,"published":57,"slug":906,"sortOrder":61,"stem":907,"website":908,"__hash__":909},"clients\u002Fclients\u002Fjasara.yml","\u002Fmedia\u002Fclients\u002Fjasara.png",{},"Jasara","jasara","clients\u002Fjasara","https:\u002F\u002Fjasara.com.au\u002F","A3fHpf2skS6TH0489Gkla5LTzU7cjjaZVeb97gIK2oU",{"id":911,"extension":10,"featured":22,"logo":912,"meta":913,"name":914,"published":57,"slug":915,"sortOrder":61,"stem":916,"website":917,"__hash__":918},"clients\u002Fclients\u002Fk2.yml","\u002Fmedia\u002Fclients\u002Fk2.webp",{},"K2 Development Group","k2","clients\u002Fk2","https:\u002F\u002Fwww.k2pdg.com.au\u002F","LupSRP0UpLiRBJuI6EaYUhiA6DmcSX4Uz19QKHQ2VmA",{"id":920,"extension":10,"featured":22,"logo":921,"meta":922,"name":923,"published":57,"slug":924,"sortOrder":61,"stem":925,"website":926,"__hash__":927},"clients\u002Fclients\u002Flandmark.yml","\u002Fmedia\u002Fclients\u002Flandmark-group.png",{},"Landmark","landmark","clients\u002Flandmark","https:\u002F\u002Flandmarkgr.com\u002F","vVq9KSV9thqNVRBVjtcYwiBJpRoqULkCOZsJUd1g0Ow",{"id":929,"extension":10,"featured":22,"logo":930,"meta":931,"name":932,"published":57,"slug":933,"sortOrder":61,"stem":934,"website":935,"__hash__":936},"clients\u002Fclients\u002Forwell.yml","\u002Fmedia\u002Fclients\u002Forwell-group-logo.jpg",{},"Orwell","orwell","clients\u002Forwell","https:\u002F\u002Fwww.orwellconstructions.com.au\u002F","1AuthZZ0hCTMGKcp1DHV6fvCKJRclHm3KjZ1Hp2YyHQ",[],[],[940,1456],{"id":941,"title":942,"author":9,"body":943,"category":1437,"description":1438,"extension":1439,"featured":22,"heroImage":1440,"heroImageAlt":319,"meta":1441,"navigation":22,"path":1442,"publishDate":1443,"published":57,"relatedProjects":1444,"seo":1445,"slug":1448,"sortOrder":56,"stem":1449,"summary":1438,"tags":1450,"__hash__":1455},"insights\u002Finsights\u002Fformwork-methods.md","Slab Formwork Methods: Table, GRIDFLEX and Conventional",{"type":944,"value":945,"toc":1410},"minimark",[946,953,957,963,978,985,988,991,994,997,1003,1006,1013,1020,1023,1042,1045,1051,1058,1061,1078,1084,1087,1090,1093,1099,1105,1108,1114,1117,1134,1137,1142,1145,1162,1165,1171,1174,1177,1183,1186,1212,1215,1221,1224,1227,1230,1236,1302,1305,1311,1317,1320,1323,1326,1332,1335,1341,1344,1350,1353,1359,1362,1368,1371,1377,1380,1386,1389,1395,1398,1401,1404],[947,948,950],"h1",{"id":949},"slab-formwork-methods-table-gridflex-and-conventional",[951,952,942],"strong",{},[954,955,956],"p",{},"Formwork is not a single construction method. On a concrete structure, the most suitable system depends on the floorplate, repetition, slab depth, programme, crane access, labour, temporary works design and the amount of irregular detailing around edges, beams, cores and penetrations.",[954,958,959,960],{},"For that reason, experienced formwork teams rarely think in terms of one system being universally \"best\". The better question is: ",[951,961,962],{},"which method gives this project the right balance of speed, accuracy, flexibility and safe execution?",[954,964,965,966,969,970,973,974,977],{},"Three approaches commonly encountered in slab construction are ",[951,967,968],{},"table formwork",", ",[951,971,972],{},"GRIDFLEX grid-element formwork",", and ",[951,975,976],{},"conventional timber and plywood formwork",". Each has a different strength, and on many projects they are used together.",[979,980,982],"h2",{"id":981},"what-slab-formwork-actually-has-to-achieve",[951,983,984],{},"What slab formwork actually has to achieve",[954,986,987],{},"Before comparing systems, it is worth remembering what the formwork is doing.",[954,989,990],{},"During a pour, the deck and its supporting structure must hold wet concrete, reinforcement, workers, equipment and construction loads while maintaining the required geometry. It must establish slab levels, edges, beams, set-downs, openings and other structural details accurately enough for the finished concrete to meet the project requirements.",[954,992,993],{},"The system also has to work as part of a construction cycle. It must be erected, checked, poured, struck and moved in a controlled sequence while the structure develops sufficient strength.",[954,995,996],{},"This is why system selection affects much more than carpentry. It influences labour, crane movements, floor-cycle time, logistics, concrete finish and the amount of adjustment required by the trades that follow.",[979,998,1000],{"id":999},"_1-table-formwork-built-for-repetition-and-floor-cycle-speed",[951,1001,1002],{},"1. Table formwork: built for repetition and floor-cycle speed",[954,1004,1005],{},"Table formwork uses large pre-assembled sections of slab formwork that can be struck and moved as complete or substantially complete units. Rather than dismantling the deck into individual joists, bearers and sheets after every pour, the table is transferred to its next position and reused.",[954,1007,1008,1009,1012],{},"That makes table systems particularly effective on ",[951,1010,1011],{},"multi-storey buildings with large, repetitive floorplates",".",[1014,1015,1017],"h3",{"id":1016},"where-table-formwork-performs-well",[951,1018,1019],{},"Where table formwork performs well",[954,1021,1022],{},"Table formwork is well suited to projects where:",[1024,1025,1026,1030,1033,1036,1039],"ul",{},[1027,1028,1029],"li",{},"floor layouts repeat from level to level;",[1027,1031,1032],{},"there are sizeable open slab areas;",[1027,1034,1035],{},"the programme benefits from a consistent floor cycle;",[1027,1037,1038],{},"the site has suitable crane or table-moving logistics;",[1027,1040,1041],{},"the project team can standardise table sizes and movement paths.",[954,1043,1044],{},"Once a table layout has been planned properly, the repetition can produce a very efficient rhythm. Teams become familiar with the sequence, fewer individual components need to be rebuilt each cycle, and the deck geometry can be reproduced consistently from floor to floor.",[1014,1046,1048],{"id":1047},"the-main-advantages",[951,1049,1050],{},"The main advantages",[954,1052,1053,1054,1057],{},"The strongest advantage is ",[951,1055,1056],{},"repeatability",". Large deck areas can be formed using assemblies that have already been built and adjusted.",[954,1059,1060],{},"Other benefits can include:",[1024,1062,1063,1066,1069,1072,1075],{},[1027,1064,1065],{},"reduced dismantling and rebuilding between floors;",[1027,1067,1068],{},"consistent deck geometry;",[1027,1070,1071],{},"fewer loose components in repetitive areas;",[1027,1073,1074],{},"efficient use of labour on large floorplates;",[1027,1076,1077],{},"fast movement when the building and lifting strategy suit the system.",[1014,1079,1081],{"id":1080},"where-tables-need-support-from-other-methods",[951,1082,1083],{},"Where tables need support from other methods",[954,1085,1086],{},"No building is made only from perfect rectangles.",[954,1088,1089],{},"Columns, cores, slab edges, penetrations, balconies, transfer zones, changes in slab geometry and infill areas can all interrupt the table layout. These locations often require smaller system elements or conventional formwork.",[954,1091,1092],{},"Crane access and movement planning also matter. A table system can be highly productive, but only when the site logistics allow the units to be struck, moved and repositioned efficiently.",[979,1094,1096],{"id":1095},"_2-gridflex-a-flexible-grid-element-slab-system",[951,1097,1098],{},"2. GRIDFLEX: a flexible grid-element slab system",[954,1100,1101,1104],{},[951,1102,1103],{},"GRIDFLEX"," is PERI's proprietary grid-element slab formwork system. Instead of relying on large pre-assembled tables, it uses lightweight grid elements supported on props, with form lining installed over the grid.",[954,1106,1107],{},"The concept provides a useful middle ground between large table systems and fully conventional formwork. It is modular and repeatable, but still adaptable around changing slab geometry.",[1014,1109,1111],{"id":1110},"where-gridflex-is-useful",[951,1112,1113],{},"Where GRIDFLEX is useful",[954,1115,1116],{},"GRIDFLEX can work particularly well where:",[1024,1118,1119,1122,1125,1128,1131],{},[1027,1120,1121],{},"slab areas repeat but are not perfectly uniform;",[1027,1123,1124],{},"the project needs a hand-set system rather than large crane-moved tables;",[1027,1126,1127],{},"there are changes in room or bay geometry;",[1027,1129,1130],{},"the team wants a modular grid that can accommodate infill areas;",[1027,1132,1133],{},"the floorplate includes a combination of regular and irregular zones.",[954,1135,1136],{},"Because the supporting grid defines the working pattern, the system can make the deck layout easy to understand on site. It can also reduce the amount of loose conventional framing required across the main slab area.",[1014,1138,1140],{"id":1139},"the-main-advantages-1",[951,1141,1050],{},[954,1143,1144],{},"A grid-element system can provide:",[1024,1146,1147,1150,1153,1156,1159],{},[1027,1148,1149],{},"good flexibility across different slab layouts;",[1027,1151,1152],{},"lightweight components that can be handled in a planned sequence;",[1027,1154,1155],{},"repeatable prop and panel\u002Fgrid positioning;",[1027,1157,1158],{},"adaptable infill around edges and irregular areas;",[1027,1160,1161],{},"reduced dependence on large table movements.",[954,1163,1164],{},"As with any proprietary formwork system, the actual configuration, slab capacity, prop arrangement, erection sequence and striking procedure must follow the project design and the manufacturer's requirements.",[979,1166,1168],{"id":1167},"_3-conventional-formwork-maximum-flexibility-for-complex-geometry",[951,1169,1170],{},"3. Conventional formwork: maximum flexibility for complex geometry",[954,1172,1173],{},"Conventional slab formwork is generally built from a combination of plywood or another form-facing material, timber or engineered beams, joists, bearers, props and supporting components.",[954,1175,1176],{},"It is the most adaptable of the three approaches because the formwork can be built around the exact geometry of the structure rather than asking the structure to suit a standard module.",[1014,1178,1180],{"id":1179},"where-conventional-formwork-remains-the-right-solution",[951,1181,1182],{},"Where conventional formwork remains the right solution",[954,1184,1185],{},"Conventional methods are particularly valuable for:",[1024,1187,1188,1191,1194,1197,1200,1203,1206,1209],{},[1027,1189,1190],{},"irregular slab shapes;",[1027,1192,1193],{},"beams and deepened zones;",[1027,1195,1196],{},"slab steps and set-downs;",[1027,1198,1199],{},"curved or angled edges;",[1027,1201,1202],{},"one-off structural details;",[1027,1204,1205],{},"penetrations and congested service zones;",[1027,1207,1208],{},"ramps, stairs and complex transitions;",[1027,1210,1211],{},"infill between proprietary systems.",[954,1213,1214],{},"This adaptability is one reason conventional formwork remains essential even on highly systemised projects.",[1014,1216,1218],{"id":1217},"the-trade-off",[951,1219,1220],{},"The trade-off",[954,1222,1223],{},"Flexibility comes with a cost in labour and planning.",[954,1225,1226],{},"A conventional deck may require more individual measurement, cutting, fixing, levelling and dismantling. Its productivity therefore depends heavily on the skill of the formwork carpenters, the quality of the set-out and the level of repetition available.",[954,1228,1229],{},"For a complicated one-off area, that extra effort is often justified. For hundreds of square metres of identical slab, a systemised method may be more efficient.",[979,1231,1233],{"id":1232},"table-gridflex-or-conventional-a-practical-comparison",[951,1234,1235],{},"Table, GRIDFLEX or conventional: a practical comparison",[1237,1238,1239,1258],"table",{},[1240,1241,1242],"thead",{},[1243,1244,1245,1249,1252,1255],"tr",{},[1246,1247,1248],"th",{},"Method",[1246,1250,1251],{},"Best suited to",[1246,1253,1254],{},"Main strengths",[1246,1256,1257],{},"Key considerations",[1259,1260,1261,1275,1288],"tbody",{},[1243,1262,1263,1266,1269,1272],{},[1264,1265,512],"td",{},[1264,1267,1268],{},"Large, repetitive multi-storey floorplates",[1264,1270,1271],{},"Fast repetition, consistent layout and reduced rebuilding",[1264,1273,1274],{},"Crane or moving logistics, table paths and irregular infill",[1243,1276,1277,1279,1282,1285],{},[1264,1278,1103],{},[1264,1280,1281],{},"Repetitive slabs with changing geometry",[1264,1283,1284],{},"Modular, flexible, hand-set grid system",[1264,1286,1287],{},"Proprietary system design, prop layout, edges and infill",[1243,1289,1290,1293,1296,1299],{},[1264,1291,1292],{},"Conventional formwork",[1264,1294,1295],{},"Complex or one-off geometry",[1264,1297,1298],{},"Maximum adaptability and custom detailing",[1264,1300,1301],{},"More labour, more loose components and greater reliance on carpentry and set-out",[954,1303,1304],{},"The right choice is rarely based on speed alone. A system that is fast in an open area can become inefficient if the project has too many interruptions, while a flexible system can save time overall by reducing difficult transitions and rework.",[979,1306,1308],{"id":1307},"the-most-effective-solution-is-often-a-hybrid",[951,1309,1310],{},"The most effective solution is often a hybrid",[954,1312,1313,1314,1012],{},"Real projects frequently use ",[951,1315,1316],{},"more than one formwork method on the same floor",[954,1318,1319],{},"A contractor might use tables through the main repetitive bays, a grid-element system through areas where the geometry changes, and conventional formwork around cores, slab edges, beams, penetrations and other non-standard details.",[954,1321,1322],{},"This hybrid approach allows each system to do the work it is best suited to.",[954,1324,1325],{},"The important part is coordination. The interfaces between systems have to maintain the same structural levels, dimensions and pour sequence. A fast main deck does not help if the edge details or infill areas become a bottleneck.",[979,1327,1329],{"id":1328},"what-should-determine-the-system-choice",[951,1330,1331],{},"What should determine the system choice?",[954,1333,1334],{},"Before selecting a slab formwork method, the project team should consider the structure as a whole.",[1014,1336,1338],{"id":1337},"floorplate-repetition",[951,1339,1340],{},"Floorplate repetition",[954,1342,1343],{},"Repeated geometry favours systems that can be reused with minimal alteration. The greater the repetition, the more value can be gained from tables or modular systems.",[1014,1345,1347],{"id":1346},"structural-complexity",[951,1348,1349],{},"Structural complexity",[954,1351,1352],{},"Transfer slabs, beams, set-downs, unusual edges and dense penetrations increase the amount of custom work. Conventional formwork or adaptable infill may become more important.",[1014,1354,1356],{"id":1355},"programme-and-floor-cycle",[951,1357,1358],{},"Programme and floor cycle",[954,1360,1361],{},"The best system should support the intended sequence of forming, reinforcement, services coordination, concrete placement, curing, striking and reshoring or backpropping.",[1014,1363,1365],{"id":1364},"site-logistics",[951,1366,1367],{},"Site logistics",[954,1369,1370],{},"Crane availability, loading zones, storage, access and the ability to move equipment between levels can change which system is practical.",[1014,1372,1374],{"id":1373},"labour-and-experience",[951,1375,1376],{},"Labour and experience",[954,1378,1379],{},"A productive system still requires a team that understands how to erect, check, adjust and strike it properly. Familiarity with the selected method can make a major difference to performance.",[1014,1381,1383],{"id":1382},"accuracy-and-finish",[951,1384,1385],{},"Accuracy and finish",[954,1387,1388],{},"The chosen system has to deliver the specified slab level, dimensions and concrete finish. Connections, joints, deflection and form-facing condition all influence the result.",[979,1390,1392],{"id":1391},"system-selection-is-ultimately-about-buildability",[951,1393,1394],{},"System selection is ultimately about buildability",[954,1396,1397],{},"The purpose of a formwork system is not simply to create a temporary deck. It is to help deliver the permanent concrete structure safely, accurately and efficiently.",[954,1399,1400],{},"Table formwork provides major advantages where repetition and movement logistics are strong. GRIDFLEX offers a modular grid with greater adaptability through changing slab layouts. Conventional formwork remains indispensable where the structure demands custom geometry and detailed carpentry.",[954,1402,1403],{},"A well-planned project uses these strengths deliberately rather than forcing one method into every area.",[954,1405,1406,1407,1409],{},"At ",[951,1408,9],{},", we approach formwork selection as part of the overall structural construction strategy. The aim is to choose and coordinate the system that best supports the geometry, programme, quality requirements and practical conditions of the project.",{"title":14,"searchDepth":244,"depth":244,"links":1411},[1412,1413,1418,1422,1426,1427,1428,1436],{"id":981,"depth":571,"text":984},{"id":999,"depth":571,"text":1002,"children":1414},[1415,1416,1417],{"id":1016,"depth":244,"text":1019},{"id":1047,"depth":244,"text":1050},{"id":1080,"depth":244,"text":1083},{"id":1095,"depth":571,"text":1098,"children":1419},[1420,1421],{"id":1110,"depth":244,"text":1113},{"id":1139,"depth":244,"text":1050},{"id":1167,"depth":571,"text":1170,"children":1423},[1424,1425],{"id":1179,"depth":244,"text":1182},{"id":1217,"depth":244,"text":1220},{"id":1232,"depth":571,"text":1235},{"id":1307,"depth":571,"text":1310},{"id":1328,"depth":571,"text":1331,"children":1429},[1430,1431,1432,1433,1434,1435],{"id":1337,"depth":244,"text":1340},{"id":1346,"depth":244,"text":1349},{"id":1355,"depth":244,"text":1358},{"id":1364,"depth":244,"text":1367},{"id":1373,"depth":244,"text":1376},{"id":1382,"depth":244,"text":1385},{"id":1391,"depth":571,"text":1394},"Formwork systems","A practical guide to table formwork, PERI GRIDFLEX and conventional formwork, including where each method works best and how contractors choose between them.","md","\u002Fmedia\u002Farticles\u002Fformwork-methods-hero.webp",{},"\u002Finsights\u002Fformwork-methods","2026-08-18",[],{"title":1446,"description":1447,"ogImage":14,"noIndex":22,"canonical":14},"Slab Formwork Methods","A practical guide to table, GRIDFLEX and conventional slab formwork, including where each method works best and how contractors choose between them.","slab-formwork-methods-table-gridflex-conventional","insights\u002Fformwork-methods",[305,1451,1452,1453,1103,1454],"Slab Formwork","Concrete Construction","Table Formwork","Conventional Formwork","DlmXMxod19i73J8GE4fZ-SguH3VUuG92RzCXFSDpXD4",{"id":1457,"title":1458,"author":9,"body":1459,"category":1836,"description":1837,"extension":1439,"featured":22,"heroImage":1838,"heroImageAlt":1839,"meta":1840,"navigation":57,"path":1841,"publishDate":1842,"published":57,"relatedProjects":1843,"seo":1844,"slug":1846,"sortOrder":61,"stem":1847,"summary":1837,"tags":1848,"__hash__":1854},"insights\u002Finsights\u002Fformwork-accuracy.md","The Structure Comes First: Why Formwork Accuracy Shapes Every Trade That Follows",{"type":944,"value":1460,"toc":1813},[1461,1466,1469,1472,1478,1481,1487,1490,1493,1496,1528,1531,1534,1540,1543,1546,1549,1552,1558,1564,1570,1573,1576,1582,1585,1588,1594,1597,1600,1606,1609,1612,1618,1621,1624,1630,1633,1639,1642,1645,1651,1654,1657,1663,1666,1669,1675,1678,1681,1687,1690,1693,1699,1702,1705,1711,1714,1720,1723,1726,1729,1735,1738,1741,1744,1767,1770,1773,1779,1782,1785,1788,1791,1797,1800,1803,1808],[947,1462,1464],{"id":1463},"the-structure-comes-first-why-formwork-accuracy-shapes-every-trade-that-follows",[951,1465,1458],{},[954,1467,1468],{},"On a reinforced concrete building, formwork is temporary, but the geometry it creates is permanent.",[954,1470,1471],{},"Before the concrete is poured, the formwork defines where the slab will sit, how high it will be, where the walls and columns will rise, where the edges will finish, and how structural openings and set-downs will align. Once the concrete gains strength and the forms are removed, those decisions have effectively become part of the building.",[954,1473,1474,1475,1012],{},"That is why formwork is ",[951,1476,1477],{},"one of the most consequential trades in concrete construction",[954,1479,1480],{},"The structural frame becomes the physical reference that many later trades inherit. If the frame is accurate, the next stages can proceed from a reliable base. If it is not, a small early deviation can become a series of adjustments, delays and compromises throughout the project.",[979,1482,1484],{"id":1483},"formwork-turns-drawings-into-physical-geometry",[951,1485,1486],{},"Formwork turns drawings into physical geometry",[954,1488,1489],{},"Structural drawings describe dimensions, levels, grids, slab thicknesses, walls, columns, beams and openings. Formwork is one of the main construction processes that converts that information into the actual shape of the building.",[954,1491,1492],{},"A few millimetres on a drawing can represent a critical interface on site.",[954,1494,1495],{},"The formwork team has to establish and maintain:",[1024,1497,1498,1501,1504,1507,1510,1513,1516,1519,1522,1525],{},[1027,1499,1500],{},"grid lines and structural locations;",[1027,1502,1503],{},"slab and beam levels;",[1027,1505,1506],{},"wall and column positions;",[1027,1508,1509],{},"plumb and alignment;",[1027,1511,1512],{},"slab edges and rebates;",[1027,1514,1515],{},"steps and set-downs;",[1027,1517,1518],{},"penetrations and box-outs;",[1027,1520,1521],{},"construction joints;",[1027,1523,1524],{},"cast-in items and embedded details;",[1027,1526,1527],{},"the geometry required for stairs, cores and vertical circulation.",[954,1529,1530],{},"Reinforcement, services and concrete placement are then coordinated within or around that geometry.",[954,1532,1533],{},"The quality of this work is therefore not judged only by whether the concrete can be poured. It is judged by whether the finished structure is where it is supposed to be.",[979,1535,1537],{"id":1536},"concrete-makes-formwork-errors-expensive-to-change",[951,1538,1539],{},"Concrete makes formwork errors expensive to change",[954,1541,1542],{},"Many construction activities can be adjusted relatively easily while the work is still open. Hardened structural concrete is different.",[954,1544,1545],{},"If an opening is missing, an edge is misplaced, a slab level is incorrect or a wall is out of alignment, the solution may involve cutting, coring, grinding, patching, engineered review or changes to the work of another trade.",[954,1547,1548],{},"Sometimes a tolerance can be accommodated without affecting the project. At other times, the same deviation can create a significant interface problem.",[954,1550,1551],{},"This is why good formwork teams focus heavily on checking before the pour. The most economical time to correct the geometry is usually while it is still formwork.",[979,1553,1555],{"id":1554},"the-trades-that-follow-inherit-the-concrete-frame",[951,1556,1557],{},"The trades that follow inherit the concrete frame",[954,1559,1560,1561,1012],{},"It is common to say that \"all trades follow the formwork\". Construction programmes are more complex than that, and many activities overlap, but the principle is sound: ",[951,1562,1563],{},"the concrete structure establishes dimensions and reference surfaces that later work has to connect to",[1014,1565,1567],{"id":1566},"façades-and-glazing",[951,1568,1569],{},"Façades and glazing",[954,1571,1572],{},"Façade systems rely on slab edges, floor-to-floor dimensions and cast-in or post-installed connections.",[954,1574,1575],{},"A consistent structural edge makes façade installation easier to set out and reduces the need for excessive packing or site adjustment. Repeated errors from floor to floor can be far more difficult to absorb.",[1014,1577,1579],{"id":1578},"internal-walls-doors-and-architectural-finishes",[951,1580,1581],{},"Internal walls, doors and architectural finishes",[954,1583,1584],{},"Partition layouts, door openings, wall junctions and finished floor levels are all influenced by the structural frame.",[954,1586,1587],{},"Columns or walls that are out of position can reduce clearances or force architectural details to change. Poor slab levels can also increase the amount of levelling or finishing work required later.",[1014,1589,1591],{"id":1590},"hydraulic-electrical-and-mechanical-services",[951,1592,1593],{},"Hydraulic, electrical and mechanical services",[954,1595,1596],{},"Services depend on coordinated penetrations, risers, sleeves, set-downs and plant areas.",[954,1598,1599],{},"A correctly positioned opening can save later drilling and coring through structural concrete. Accurate levels and set-downs are also important where drainage, waterproofing or equipment interfaces depend on the structure.",[1014,1601,1603],{"id":1602},"stairs-lifts-and-vertical-circulation",[951,1604,1605],{},"Stairs, lifts and vertical circulation",[954,1607,1608],{},"Lift cores, stair flights, landings and openings require particularly careful geometry because multiple levels have to align vertically.",[954,1610,1611],{},"Errors can compound as the building rises, which is why survey control and repeatable formwork processes are so important in cores and other vertical elements.",[1014,1613,1615],{"id":1614},"waterproofing-and-floor-finishes",[951,1616,1617],{},"Waterproofing and floor finishes",[954,1619,1620],{},"Wet areas, balconies, podiums and drainage zones often depend on the correct structural set-downs and levels being built at the concrete stage.",[954,1622,1623],{},"Finishes can correct minor surface variation, but they should not be expected to compensate for major structural geometry problems.",[979,1625,1627],{"id":1626},"accuracy-is-created-by-a-process-not-a-final-inspection",[951,1628,1629],{},"Accuracy is created by a process, not a final inspection",[954,1631,1632],{},"Accurate formwork is not achieved by measuring the deck once before concrete arrives. It is the result of a controlled process from set-out through to striking.",[1014,1634,1636],{"id":1635},"_1-start-from-reliable-survey-control",[951,1637,1638],{},"1. Start from reliable survey control",[954,1640,1641],{},"Grid lines, benchmarks and reference points need to be established clearly and transferred through the structure in a controlled way.",[954,1643,1644],{},"Every floor depends on the quality of the information carried forward from the previous one.",[1014,1646,1648],{"id":1647},"_2-build-to-the-structural-geometry",[951,1649,1650],{},"2. Build to the structural geometry",[954,1652,1653],{},"Deck levels, beam depths, wall positions, column dimensions and slab edges must be formed against the current project documentation.",[954,1655,1656],{},"Complex areas deserve extra attention because they are where several dimensions and trades often meet.",[1014,1658,1660],{"id":1659},"_3-coordinate-openings-and-cast-in-items-before-the-pour",[951,1661,1662],{},"3. Coordinate openings and cast-in items before the pour",[954,1664,1665],{},"Penetrations, sleeves, rebates, block-outs and embeds should be checked while they can still be repositioned.",[954,1667,1668],{},"A missing box-out that takes minutes to correct before concrete may take considerably more effort after the slab is poured.",[1014,1670,1672],{"id":1671},"_4-check-line-level-and-plumb",[951,1673,1674],{},"4. Check line, level and plumb",[954,1676,1677],{},"The formwork has to maintain its intended position under construction loads and during concrete placement.",[954,1679,1680],{},"Bracing, propping, connections and the condition of the formwork all contribute to whether the final concrete remains within the required geometry.",[1014,1682,1684],{"id":1683},"_5-consider-deflection-and-the-support-sequence",[951,1685,1686],{},"5. Consider deflection and the support sequence",[954,1688,1689],{},"The deck is not only a shape. It is a temporary load-bearing system.",[954,1691,1692],{},"Formwork design, prop spacing, reshoring or backpropping strategy, concrete strength and the sequence of striking all influence the behaviour of the structure during the construction cycle.",[1014,1694,1696],{"id":1695},"_6-perform-a-disciplined-pre-pour-check",[951,1697,1698],{},"6. Perform a disciplined pre-pour check",[954,1700,1701],{},"A good pre-pour process brings together the formwork, reinforcement, services, survey and concrete requirements before the work becomes permanent.",[954,1703,1704],{},"The exact process varies between projects, but the objective is consistent: identify issues when they are still practical to correct.",[979,1706,1708],{"id":1707},"speed-and-accuracy-are-not-opposites",[951,1709,1710],{},"Speed and accuracy are not opposites",[954,1712,1713],{},"High-performing formwork is often described in terms of floor-cycle speed. Speed matters, especially on repetitive multi-storey structures, but the fastest deck is not the one that is simply erected first.",[954,1715,1716,1717,1012],{},"A productive cycle is one that can be ",[951,1718,1719],{},"repeated reliably",[954,1721,1722],{},"If a rushed floor creates missing penetrations, inconsistent slab edges or geometry that requires downstream rework, the apparent time saving can quickly disappear.",[954,1724,1725],{},"Systemisation is valuable because it allows the team to build the same way repeatedly. Standard table layouts, modular slab systems, planned conventional details, consistent control points and repeatable pre-pour checks can improve both speed and quality.",[954,1727,1728],{},"The objective is not to choose between productivity and accuracy. It is to build a process where accuracy supports productivity.",[979,1730,1732],{"id":1731},"good-formwork-reduces-uncertainty-for-the-whole-project",[951,1733,1734],{},"Good formwork reduces uncertainty for the whole project",[954,1736,1737],{},"Construction becomes more difficult when each trade has to discover and compensate for the work that came before it.",[954,1739,1740],{},"A reliable concrete frame does the opposite. It gives following trades confidence in the dimensions they are working from.",[954,1742,1743],{},"That can mean:",[1024,1745,1746,1749,1752,1755,1758,1761,1764],{},[1027,1747,1748],{},"more predictable façade interfaces;",[1027,1750,1751],{},"cleaner service coordination;",[1027,1753,1754],{},"fewer unplanned penetrations;",[1027,1756,1757],{},"less corrective patching and grinding;",[1027,1759,1760],{},"better alignment of architectural elements;",[1027,1762,1763],{},"more consistent floor-to-floor construction;",[1027,1765,1766],{},"fewer site decisions caused by avoidable structural deviations.",[954,1768,1769],{},"Not every downstream issue is caused by formwork, and not every tolerance issue can be eliminated. Buildings are constructed by many teams and materials, each with its own tolerances and interfaces.",[954,1771,1772],{},"But because formwork establishes so much of the structural geometry, its quality has an unusually wide influence.",[979,1774,1776],{"id":1775},"formwork-quality-can-also-become-part-of-the-finished-architecture",[951,1777,1778],{},"Formwork quality can also become part of the finished architecture",[954,1780,1781],{},"When concrete is exposed, the relationship is even more obvious.",[954,1783,1784],{},"The form face, panel joints, tie locations, corners and junctions can all be reflected in the finished surface. In these areas, the formwork is effectively creating both a structural element and an architectural finish.",[954,1786,1787],{},"Consistency in the temporary work becomes visible in the permanent building.",[954,1789,1790],{},"This is another reason accurate planning, clean detailing and appropriate form-facing materials matter. What happens before the pour can determine what people see for the life of the structure.",[979,1792,1794],{"id":1793},"the-strongest-projects-treat-formwork-as-structural-delivery",[951,1795,1796],{},"The strongest projects treat formwork as structural delivery",[954,1798,1799],{},"Calling formwork \"temporary works\" can sometimes understate its importance. The materials may be temporary, but their job is to create the permanent structural frame.",[954,1801,1802],{},"The best outcomes come when formwork contractors work closely with engineers, surveyors, reinforcement crews, services trades, concreters, crane crews and site management. Each group has information that affects the pour, and the formwork is often the physical platform where those requirements meet.",[954,1804,1406,1805,1807],{},[951,1806,9],{},", our approach is to treat formwork as structural delivery rather than simply temporary carpentry. Accuracy, buildability, coordination and repeatability are considered together because a well-built concrete frame gives every stage that follows a stronger starting point.",[954,1809,1810],{},[951,1811,1812],{},"Accuracy is not something added to a structure at the end. It is built into the structure from the formwork stage.",{"title":14,"searchDepth":244,"depth":244,"links":1814},[1815,1816,1817,1824,1832,1833,1834,1835],{"id":1483,"depth":571,"text":1486},{"id":1536,"depth":571,"text":1539},{"id":1554,"depth":571,"text":1557,"children":1818},[1819,1820,1821,1822,1823],{"id":1566,"depth":244,"text":1569},{"id":1578,"depth":244,"text":1581},{"id":1590,"depth":244,"text":1593},{"id":1602,"depth":244,"text":1605},{"id":1614,"depth":244,"text":1617},{"id":1626,"depth":571,"text":1629,"children":1825},[1826,1827,1828,1829,1830,1831],{"id":1635,"depth":244,"text":1638},{"id":1647,"depth":244,"text":1650},{"id":1659,"depth":244,"text":1662},{"id":1671,"depth":244,"text":1674},{"id":1683,"depth":244,"text":1686},{"id":1695,"depth":244,"text":1698},{"id":1707,"depth":571,"text":1710},{"id":1731,"depth":571,"text":1734},{"id":1775,"depth":571,"text":1778},{"id":1793,"depth":571,"text":1796},"Formwork and quality","Why accurate formwork matters to the entire construction process, from concrete geometry and floor levels to façades, services, finishes and project productivity.","\u002Fmedia\u002Farticles\u002Fformwork-accuracy-hero.webp","Construction crew working across dense slab reinforcement on a large concrete building site.",{},"\u002Finsights\u002Fformwork-accuracy","2026-06-12",[],{"title":1845,"description":1837,"ogImage":14,"noIndex":22,"canonical":14},"Why Formwork Accuracy Matters","why-formwork-accuracy-matters-concrete-construction","insights\u002Fformwork-accuracy",[305,1849,1850,1851,1852,1853],"Concrete Structure","Construction Accuracy","Structural Concrete","Quality","Construction Planning","oxuwwG8ozp_F9kIUHFA8HtjPE6zf5g5cF7SIcpoRG7g",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1856,"hidden":57},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M12.83 2.18a2 2 0 0 0-1.66 0L2.6 6.08a1 1 0 0 0 0 1.83l8.58 3.91a2 2 0 0 0 1.66 0l8.58-3.9a1 1 0 0 0 0-1.83Z\"\u002F>\u003Cpath d=\"m6.08 9.5l-3.5 1.6a1 1 0 0 0 0 1.81l8.6 3.91a2 2 0 0 0 1.65 0l8.58-3.9a1 1 0 0 0 0-1.83l-3.5-1.59\"\u002F>\u003Cpath d=\"m6.08 14.5l-3.5 1.6a1 1 0 0 0 0 1.81l8.6 3.91a2 2 0 0 0 1.65 0l8.58-3.9a1 1 0 0 0 0-1.83l-3.5-1.59\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1858},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Crect width=\"18\" height=\"18\" x=\"3\" y=\"3\" rx=\"2\"\u002F>\u003Cpath d=\"M3 9h18M9 21V9\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1860},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Crect width=\"13\" height=\"7\" x=\"8\" y=\"3\" rx=\"1\"\u002F>\u003Cpath d=\"m2 9l3 3l-3 3\"\u002F>\u003Crect width=\"13\" height=\"7\" x=\"8\" y=\"14\" rx=\"1\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1862},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M10 22V7a1 1 0 0 0-1-1H4a2 2 0 0 0-2 2v12a2 2 0 0 0 2 2h12a2 2 0 0 0 2-2v-5a1 1 0 0 0-1-1H2\"\u002F>\u003Crect width=\"8\" height=\"8\" x=\"14\" y=\"2\" rx=\"1\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1864},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M7 7h10v10M7 17L17 7\"\u002F>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1866},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M10 10V5a1 1 0 0 1 1-1h2a1 1 0 0 1 1 1v5m0-4a6 6 0 0 1 6 6v3M4 15v-3a6 6 0 0 1 6-6\"\u002F>\u003Crect width=\"20\" height=\"4\" x=\"2\" y=\"15\" rx=\"1\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1868},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Crect width=\"8\" height=\"4\" x=\"8\" y=\"2\" rx=\"1\" ry=\"1\"\u002F>\u003Cpath d=\"M16 4h2a2 2 0 0 1 2 2v14a2 2 0 0 1-2 2H6a2 2 0 0 1-2-2V6a2 2 0 0 1 2-2h2\"\u002F>\u003Cpath d=\"m9 14l2 2l4-4\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1870},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"m11 17l2 2a1 1 0 1 0 3-3\"\u002F>\u003Cpath d=\"m14 14l2.5 2.5a1 1 0 1 0 3-3l-3.88-3.88a3 3 0 0 0-4.24 0l-.88.88a1 1 0 1 1-3-3l2.81-2.81a5.79 5.79 0 0 1 7.06-.87l.47.28a2 2 0 0 0 1.42.25L21 4\"\u002F>\u003Cpath d=\"m21 3l1 11h-2M3 3L2 14l6.5 6.5a1 1 0 1 0 3-3M3 4h8\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1872},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M10 12h4m-4-4h4m0 13v-3a2 2 0 0 0-4 0v3\"\u002F>\u003Cpath d=\"M6 10H4a2 2 0 0 0-2 2v7a2 2 0 0 0 2 2h16a2 2 0 0 0 2-2V9a2 2 0 0 0-2-2h-2\"\u002F>\u003Cpath d=\"M6 21V5a2 2 0 0 1 2-2h8a2 2 0 0 1 2 2v16\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1874},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Ccircle cx=\"12\" cy=\"12\" r=\"10\"\u002F>\u003Cpath d=\"M12 6v6h4\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1876},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M20 13c0 5-3.5 7.5-7.66 8.95a1 1 0 0 1-.67-.01C7.5 20.5 4 18 4 13V6a1 1 0 0 1 1-1c2 0 4.5-1.2 6.24-2.72a1.17 1.17 0 0 1 1.52 0C14.51 3.81 17 5 19 5a1 1 0 0 1 1 1z\"\u002F>\u003Cpath d=\"m9 12l2 2l4-4\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1878},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M3 7V5a2 2 0 0 1 2-2h2m10 0h2a2 2 0 0 1 2 2v2m0 10v2a2 2 0 0 1-2 2h-2M7 21H5a2 2 0 0 1-2-2v-2m4-5h10\"\u002F>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1880},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M8 2v3m8-3v3\"\u002F>\u003Crect width=\"18\" height=\"18\" x=\"3\" y=\"3\" rx=\"2\"\u002F>\u003Cpath d=\"M3 9h18M9 15l2 2l4-4\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1882},"\u003Cg fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\">\u003Cpath d=\"M18 21a8 8 0 0 0-16 0\"\u002F>\u003Ccircle cx=\"10\" cy=\"8\" r=\"5\"\u002F>\u003Cpath d=\"M22 20c0-3.37-2-6.5-4-8a5 5 0 0 0-.45-8.3\"\u002F>\u003C\u002Fg>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1884},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M5 12h14\"\u002F>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1886},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M21.3 15.3a2.4 2.4 0 0 1 0 3.4l-2.6 2.6a2.4 2.4 0 0 1-3.4 0L2.7 8.7a2.41 2.41 0 0 1 0-3.4l2.6-2.6a2.41 2.41 0 0 1 3.4 0Zm-6.8-2.8l2-2m-5-1l2-2m-5-1l2-2m7 11l2-2\"\u002F>",{"left":56,"top":56,"width":179,"height":179,"rotate":56,"vFlip":22,"hFlip":22,"body":1888},"\u003Cpath fill=\"none\" stroke=\"currentColor\" stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M5 12h14m-7-7v14\"\u002F>",1789649362798]